Energy and water
37 answers- Power sector regulation under General Electricity Law 93-96AMM
- Wholesale price formation (POE) and dollar settlementAMM
- Wholesale market participants, from generators to large users63Registered generatorsAMMApr 1, 2025
- 2025 electricity generation mix and renewable share15,755.61 GWhTotal national grid incl. imports and deviationsAMM2025
- 2025 SNI production, consumption and average spot price75.58%+0.95%Load factorAMM2025
- 2025 record peak demand and consumption by segment2,204.22 MWRecord peak demandAMMApr 8, 2025
- Power generation in 2024, the dry reference year13,117.41 GWhLocal generationAMM2024
- Generation seasonality and industrial operating riskAMM
- CNEE tariff-setting mechanism and extra charges on the billCNEE
- Regulated EEGSA, DEOCSA and DEORSA tariffs and the social tariffCNEE
- Industrial demand-based tariffs at low and medium voltageCNEE
- Gran Usuario status and buying power outside the regulated tariff1,410Registered large usersAMMApr 1, 2025
See 29 more answersSee 25 more answers
- CNEE tariff-setting mechanism and extra charges on the billCNEE
- Regulated EEGSA, DEOCSA and DEORSA tariffs and the social tariffCNEE
- Industrial demand-based tariffs at low and medium voltageCNEE
- Gran Usuario status and buying power outside the regulated tariff1,410Registered large usersAMMApr 1, 2025
- PPA contract types and firm-capacity backing obligationsAMM
- PEG-4-2022 tender awards and pricesMEM
- The PEG-5-2025 tender and its terms of reference~1,400 MWCapacity sought in PEG-5MEM/FUNDESAMay 1, 2030
- PEG-5 bids, MW submitted and process timelineEnergía Estratégica
- PEG-5 award outcome: projects, MW and pricePrensa Libre
- Transmission expansion plans and tenders (PET) and built worksMEM
- Transmission tolls: who sets them and ETCEE's charge15Transmission companies authorised in the wholesale marketAMMApr 1, 2025
- EEGSA's ownership and service areaEEGSA
- Energuate (DEOCSA and DEORSA) ownership and customer basePrensa Libre
- National electricity coverage and rural electrification investment≥US$900 MUniversal-coverage challengeMEM/FUNDESA2025
- Renewable energy tax incentives under Decree 52-2003CNEE
- Self-generation and installed distributed renewable generation (GDR)<5 MWGDR thresholdAMM
- Grid reliability and SAIDI/SAIFI outage indicesCNEE
- Industrial water and private wells in a country with no water lawNo-Ficción
- Water law initiative 6816 and its status in CongressNo-Ficción
- Wastewater discharges under Government Accord 236-20062 May 2025Extension for municipalities (AG 285-2022)MARN2025
- Telecom operators and the SIT as sector regulatorLey General de Tel
- 700 MHz and 2.5 GHz spectrum auctions and 5G coverageCentroamérica360
- Submarine cables and their landing points in GuatemalaTeleGeography Submarine Cable
- Data centers and industrial connectivity costsData Center Map
- Internet penetration and connection speedsDataReportal
- SNI installed capacity and wholesale market unit charges3,559.2 MWInstalled capacity of the power systemMEM/INE2024
- Official energy, tariff, telecom and water-law data seriesAMM
- Decreto 11-2026: temporary support of Q 8 per gallon of diesel and Q 5 per gallon of gasoline, three months, Q 2,000 millionQ 8.00Support per gallon of dieselDecreto 11-20262026
- Generation mix by technology, 2026 months (AMM monthly market analysis, text)AMM