Skip to content

Latest figures

Can I self-generate or install distributed renewable generation at my plant, and how much is installed nationally?

According to the cited documents200 MW: press figureEnergy and water

GDR threshold

<5 MW

In forceAMM

The Distributed Renewable Generator (GDR) category covers plants under 5 MW; as of 1 April 2025 there were 64 GDRs registered with the AMM. According to Energia Estrategica, Guatemala has passed 200 MW installed between self-producers and GDRs; that is a press figure.

Read moreRead less
  • Registered GDRs64As of Apr 1, 2025AMM
  • Installed between self-producers and GDRs (press)>200 MWPer Energía EstratégicaEnergía Estratégica

Sources

  • Energía Estratégica

    Guatemala superó los 200 MW instalados entre autoproductores y generación distribuida renovable

    • Installed between self-producers and GDRs (press)
    energiaestrategica.comAccessed Aug 19, 2026Go to the source
  • CNEE

    Informe estadístico de GDR y UAEE 2020-2024

    cnee.gob.gtAccessed Aug 19, 2026Go to the source
  • AMM

    Oportunidades de inversión, Tabla 1

    • GDR threshold
    • Registered GDRs
    amm.org.gtAccessed Aug 19, 2026Go to the source