Private construction cost, Zacapa

Latest, Q4 2024Q2.2MAnnual release
vs Q3 2024−78.3%Q9.9M
vs Q4 2023−94.3%Q38.1M
Highest since 2023Q38.1MQ4 2023 · INE
Lowest since 2023Q2.2MQ4 2024 · INE

Over time

Q millionYear on yearQ1 2023 to Q4 2024

Each quarterly figure over the span you pick, or under Change each against the same quarter a year earlier; source: INE.

Recent quarters

The latest quarters, newest first, each with its change on the one before when one publisher gives both.

  1. Q4 2024Q2.2M−78.3% (worse)
  2. Q3 2024Q9.9M+131.2% (better)
  3. Q2 2024Q4.3M−62.0% (worse)
  4. Q1 2024Q11.3M−70.2% (worse)
  5. Q4 2023Q38.1M+572.7% (better)
  6. Q3 2023Q5.7M+77.4% (better)
  7. Q2 2023Q3.2M−46.1% (worse)
  8. Q1 2023Q5.9M

By department

The same measure in each department, shaded on the map and ranked in the list with its share of their sum.

Other figures from this topic, each with its latest value, its period and its publisher.