Private construction cost, Retalhuleu
Latest, Q4 2024Q23.5MAnnual release
vs Q3 2024+42.3%Q16.5M
vs Q4 2023+251.3%Q6.7M
Highest since 2023Q23.5MQ4 2024 · INE
Lowest since 2023Q1.3MQ1 2023 · INE
Over time
Q millionYear on yearQ1 2023 to Q4 2024Each quarterly figure over the span you pick, or under Change each against the same quarter a year earlier; source: INE.
Recent quarters
The latest quarters, newest first, each with its change on the one before when one publisher gives both.
- Q4 2024Q23.5M+42.3% (better)
- Q3 2024Q16.5M−16.0% (worse)
- Q2 2024Q19.7M+12.7% (better)
- Q1 2024Q17.5M+160.6% (better)
- Q4 2023Q6.7M−53.6% (worse)
- Q3 2023Q14.4M+15.5% (better)
- Q2 2023Q12.5M+861.6% (better)
- Q1 2023Q1.3M
By department
The same measure in each department, shaded on the map and ranked in the list with its share of their sum.
- Q1.0M to Q2.5M
- Q4.1M to Q10.6M
- Q12.6M to Q25.5M
- Q26.0M to Q109.9M
- Q1.25B
- No figure
Related
Other figures from this topic, each with its latest value, its period and its publisher.
- Permitted floor area, national total2,454,227m²+2.5%vs Q3 2024betterQ4 2024INE(go to the source)
- Building permits, national total2,772permits−4.9%vs Q3 2024worseQ4 2024INE(go to the source)
- GDP, manufacturingQ125.0BThe publisher marks this figure as preliminary2025 p/Banguat(go to the source)
- GDP, mining and quarryingQ3.8BThe publisher marks this figure as preliminary2025 p/Banguat(go to the source)