Private construction cost, Quetzaltenango
Latest, Q4 2024Q50.3MAnnual release
vs Q3 2024+139.2%Q21.0M
vs Q4 2023−19.5%Q62.5M
High since 2023Q65.5MQ3 2023 · INE
Low since 2023Q21.0MQ3 2024 · INE
Recent quarters
- Q4 2024Q50.3M+139.2% (better)
- Q3 2024Q21.0M−57.0% (worse)
- Q2 2024Q48.9M+18.1% (better)
- Q1 2024Q41.4M−33.7% (worse)
- Q4 2023Q62.5M−4.6% (worse)
- Q3 2023Q65.5M+78.7% (better)
- Q2 2023Q36.6M−24.2% (worse)
- Q1 2023Q48.4M
By department
- Q1.0 M to Q2.5 M
- Q4.1 M to Q10.6 M
- Q12.6 M to Q25.5 M
- Q26.0 M to Q109.9 M
- Q1,248.8 M
- No figure
Related
- Permitted floor area, national totalINE2,454,227m²Q4 2024+2.5%vs Q3 2024
- Building permits, national totalINE2,772permitsQ4 2024−4.9%vs Q3 2024
- GDP, manufacturingBanguatQ125.0B2025+5.1%vs 2024
- GDP, mining and quarryingBanguatQ3.8B2025+5.3%vs 2024
