Private construction cost, Suchitepéquez

Latest, Q4 2024Q25.5MAnnual release
vs Q3 2024+13.2%Q22.5M
vs Q4 2023+16.0%Q22.0M
High since 2023Q25.5MQ4 2024 · INE
Low since 2023Q10.2MQ1 2023 · INE

Over time

Q millionQ1 2023 - Q4 2024

Recent quarters

  1. Q4 2024Q25.5M+13.2% (better)
  2. Q3 2024Q22.5M−1.8% (worse)
  3. Q2 2024Q22.9M+14.1% (better)
  4. Q1 2024Q20.1M−8.5% (worse)
  5. Q4 2023Q22.0M+105.2% (better)
  6. Q3 2023Q10.7M−50.0% (worse)
  7. Q2 2023Q21.4M+110.7% (better)
  8. Q1 2023Q10.2M
  1. Q1.0 M to Q2.5 M
  2. Q4.1 M to Q10.6 M
  3. Q12.6 M to Q25.5 M
  4. Q26.0 M to Q109.9 M
  5. Q1,248.8 M
  6. No figure