Private construction cost, Guatemala
Latest, Q4 2024Q1.25BAnnual release
vs Q3 2024−12.3%Q1.42B
vs Q4 2023−28.9%Q1.76B
Highest since 2023Q1.76BQ4 2023 · INE
Lowest since 2023Q644.5MQ2 2023 · INE
Over time
Q millionYear on yearQ1 2023 to Q4 2024Each quarterly figure over the span you pick, or under Change each against the same quarter a year earlier; source: INE.
Recent quarters
The latest quarters, newest first, each with its change on the one before when one publisher gives both.
- Q4 2024Q1.25B−12.3% (worse)
- Q3 2024Q1.42B+0.9% (better)
- Q2 2024Q1.41B+14.6% (better)
- Q1 2024Q1.23B−29.9% (worse)
- Q4 2023Q1.76B+60.0% (better)
- Q3 2023Q1.10B+70.4% (better)
- Q2 2023Q644.5M−11.2% (worse)
- Q1 2023Q725.8M
By department
The same measure in each department, shaded on the map and ranked in the list with its share of their sum.
- Q1.0M to Q2.5M
- Q4.1M to Q10.6M
- Q12.6M to Q25.5M
- Q26.0M to Q109.9M
- Q1.25B
- No figure
Related
Other figures from this topic, each with its latest value, its period and its publisher.
- Permitted floor area, national total2,454,227m²+2.5%vs Q3 2024betterQ4 2024INE(go to the source)
- Building permits, national total2,772permits−4.9%vs Q3 2024worseQ4 2024INE(go to the source)
- GDP, manufacturingQ125.0BThe publisher marks this figure as preliminary2025 p/Banguat(go to the source)
- GDP, mining and quarryingQ3.8BThe publisher marks this figure as preliminary2025 p/Banguat(go to the source)
