Permitted floor area, national total
Latest, Q4 20242,454,227m²Annual release
vs Q3 2024+2.5%2,393,729
vs Q4 2023+32.1%1,858,226
Highest since 20239,551,915m²Q1 2024 · INE
Lowest since 2023699,539m²Q1 2023 · INE
Over time
m²Year on yearQ1 2023 to Q4 2024Each quarterly figure over the span you pick, or under Change each against the same quarter a year earlier; source: INE.
Recent quarters
The latest quarters, newest first, each with its change on the one before when one publisher gives both.
- Q4 20242,454,227m²+2.5% (better)
- Q3 20242,393,729m²+51.5% (better)
- Q2 20241,579,949m²−83.5% (worse)
- Q1 20249,551,915m²+414.0% (better)
- Q4 20231,858,226m²+52.2% (better)
- Q3 20231,220,827m²+50.3% (better)
- Q2 2023812,417m²+16.1% (better)
- Q1 2023699,539m²
By department
The same measure in each department, shaded on the map and ranked in the list with its share of their sum.
- 466 to 5,103.58
- 5,492.88 to 10,265.4
- 14,358.01 to 20,223.25
- 30,517.63 to 753,103
- 1,214,015
- No figure
Related
Other figures from this topic, each with its latest value, its period and its publisher.
- Building permits, national total2,772permits−4.9%vs Q3 2024worseQ4 2024INE(go to the source)
- GDP, manufacturingQ125.0BThe publisher marks this figure as preliminary2025 p/Banguat(go to the source)
- GDP, mining and quarryingQ3.8BThe publisher marks this figure as preliminary2025 p/Banguat(go to the source)
- Building permits, Alta Verapaz70permits+12.9%vs Q3 2024betterQ4 2024INE(go to the source)
