Permitted floor area, Izabal
Latest, Q4 2024753,103m²Annual release
vs Q3 2024+25,748.0%2,913.58
vs Q4 2023+16,329.0%4,584
Highest since 2023753,103m²Q4 2024 · INE
Lowest since 2023305.6m²Q1 2023 · INE
Over time
m²Year on yearQ1 2023 to Q4 2024Each quarterly figure over the span you pick, or under Change each against the same quarter a year earlier; source: INE.
Recent quarters
The latest quarters, newest first, each with its change on the one before when one publisher gives both.
- Q4 2024753,103m²+25,748.0% (better)
- Q3 20242,913.58m²−24.5% (worse)
- Q2 20243,861.35m²−39.3% (worse)
- Q1 20246,357.36m²+38.7% (better)
- Q4 20234,584m²+62.1% (better)
- Q3 20232,827.38m²−50.1% (worse)
- Q2 20235,664.17m²+1,753.5% (better)
- Q1 2023305.6m²
By department
The same measure in each department, shaded on the map and ranked in the list with its share of their sum.
- 466 to 5,103.58
- 5,492.88 to 10,265.4
- 14,358.01 to 20,223.25
- 30,517.63 to 753,103
- 1,214,015
- No figure
Related
Other figures from this topic, each with its latest value, its period and its publisher.
- Permitted floor area, national total2,454,227m²+2.5%vs Q3 2024betterQ4 2024INE(go to the source)
- Building permits, national total2,772permits−4.9%vs Q3 2024worseQ4 2024INE(go to the source)
- GDP, manufacturingQ125.0BThe publisher marks this figure as preliminary2025 p/Banguat(go to the source)
- GDP, mining and quarryingQ3.8BThe publisher marks this figure as preliminary2025 p/Banguat(go to the source)