Private construction cost, Sololá
Latest, Q4 2024Q9.1MAnnual release
vs Q3 2024+135.7%Q3.9M
vs Q4 2023+13,926.7%Q0.06 M
High since 2023Q9.1MQ4 2024 · INE
Low since 2023Q0.02MQ2 2023 · INE
Recent quarters
- Q4 2024Q9.1M+135.7% (better)
- Q3 2024Q3.9M−16.7% (worse)
- Q2 2024Q4.6M+69.8% (better)
- Q1 2024Q2.7M+4,105.1% (better)
- Q4 2023Q0.06M−50.6% (worse)
- Q3 2023Q0.1M+658.4% (better)
- Q2 2023Q0.02M−98.3% (worse)
- Q1 2023Q1.0M
By department
- Q1.0 M to Q2.5 M
- Q4.1 M to Q10.6 M
- Q12.6 M to Q25.5 M
- Q26.0 M to Q109.9 M
- Q1,248.8 M
- No figure
Related
- Permitted floor area, national totalINE2,454,227m²Q4 2024+2.5%vs Q3 2024
- Building permits, national totalINE2,772permitsQ4 2024−4.9%vs Q3 2024
- GDP, manufacturingBanguatQ125.0B2025+5.1%vs 2024
- GDP, mining and quarryingBanguatQ3.8B2025+5.3%vs 2024
