Private construction cost, Izabal
Latest, Q4 2024Q2.4MAnnual release
vs Q3 2024−26.5%Q3.3M
vs Q4 2023−31.8%Q3.6M
High since 2023Q7.2MQ1 2024 · INE
Low since 2023Q0.3MQ1 2023 · INE
Recent quarters
- Q4 2024Q2.4M−26.5% (worse)
- Q3 2024Q3.3M−22.5% (worse)
- Q2 2024Q4.3M−40.4% (worse)
- Q1 2024Q7.2M+100.8% (better)
- Q4 2023Q3.6M−17.2% (worse)
- Q3 2023Q4.3M−29.6% (worse)
- Q2 2023Q6.1M+2,102.3% (better)
- Q1 2023Q0.3M
By department
- Q1.0 M to Q2.5 M
- Q4.1 M to Q10.6 M
- Q12.6 M to Q25.5 M
- Q26.0 M to Q109.9 M
- Q1,248.8 M
- No figure
Related
- Permitted floor area, national totalINE2,454,227m²Q4 2024+2.5%vs Q3 2024
- Building permits, national totalINE2,772permitsQ4 2024−4.9%vs Q3 2024
- GDP, manufacturingBanguatQ125.0B2025+5.1%vs 2024
- GDP, mining and quarryingBanguatQ3.8B2025+5.3%vs 2024
