Private construction cost, Totonicapán
Latest, Q2 2024Q75,000Annual release · Not updated
vs Q1 2024+485.4%Q12,812
vs Q2 2023−87.5%Q600,000
Highest since Q2 2023Q600,000Q2 2023 · INE
Lowest since Q2 2023Q12,812Q1 2024 · INE
Recent quarters
The latest quarters, newest first, each but the oldest with its change on the one before.
- Q2 2024Q75,000+485.4% (better)
- Q1 2024Q12,812−97.9% (worse)
- Q2 2023Q600,000
By department
The same measure in each department, shaded on the map and ranked in the list with its share of their sum.
- Q1.0M to Q2.5M
- Q4.1M to Q10.6M
- Q12.6M to Q25.5M
- Q26.0M to Q109.9M
- Q1.25B
- No figure
Related
Other figures from this topic, each with its latest value, its period and its publisher.
- Permitted floor area, national total2,454,227m²+2.5%vs Q3 2024betterQ4 2024INE(go to the source)
- Building permits, national total2,772permits−4.9%vs Q3 2024worseQ4 2024INE(go to the source)
- GDP, manufacturingQ125.0BThe publisher marks this figure as preliminary2025 p/Banguat(go to the source)
- GDP, mining and quarryingQ3.8BThe publisher marks this figure as preliminary2025 p/Banguat(go to the source)