Permitted floor area, Chiquimula
Latest, Q4 202414,358.01m²Annual release
vs Q3 2024+239.3%4,231.93
vs Q4 2023+627.0%1,975
Highest since 202316,494m²Q3 2023 · INE
Lowest since 20231,390.96m²Q2 2023 · INE
Over time
m²Year on yearQ1 2023 to Q4 2024Each quarterly figure over the span you pick, or under Change each against the same quarter a year earlier; source: INE.
Recent quarters
The latest quarters, newest first, each with its change on the one before when one publisher gives both.
- Q4 202414,358.01m²+239.3% (better)
- Q3 20244,231.93m²−12.5% (worse)
- Q2 20244,835.23m²−14.9% (worse)
- Q1 20245,682.69m²+187.7% (better)
- Q4 20231,975m²−88.0% (worse)
- Q3 202316,494m²+1,085.8% (better)
- Q2 20231,390.96m²−59.7% (worse)
- Q1 20233,455.48m²
By department
The same measure in each department, shaded on the map and ranked in the list with its share of their sum.
- 466 to 5,103.58
- 5,492.88 to 10,265.4
- 14,358.01 to 20,223.25
- 30,517.63 to 753,103
- 1,214,015
- No figure
Related
Other figures from this topic, each with its latest value, its period and its publisher.
- Permitted floor area, national total2,454,227m²+2.5%vs Q3 2024betterQ4 2024INE(go to the source)
- Building permits, national total2,772permits−4.9%vs Q3 2024worseQ4 2024INE(go to the source)
- GDP, manufacturingQ125.0BThe publisher marks this figure as preliminary2025 p/Banguat(go to the source)
- GDP, mining and quarryingQ3.8BThe publisher marks this figure as preliminary2025 p/Banguat(go to the source)