Building permits, Guatemala
Latest, Q4 20241,914permitsAnnual release
vs Q3 2024−3.5%1,984
vs Q4 2023+30.9%1,462
High since 20231,984permitsQ3 2024 · INE
Low since 20231,462permitsQ4 2023 · INE
Recent quarters
- Q4 20241,914permits−3.5% (worse)
- Q3 20241,984permits+0.4% (better)
- Q2 20241,976permits+27.6% (better)
- Q1 20241,549permits+6.0% (better)
- Q4 20231,462permits−23.5% (worse)
- Q3 20231,911permits+20.0% (better)
- Q2 20231,593permits−3.7% (worse)
- Q1 20231,655permits
By department
- 7 to 14
- 15 to 23
- 38 to 70
- 72 to 121
- 1,914
- No figure
Related
- Permitted floor area, national totalINE2,454,227m²Q4 2024+2.5%vs Q3 2024
- Building permits, national totalINE2,772permitsQ4 2024−4.9%vs Q3 2024
- GDP, manufacturingBanguatQ125.0B2025+5.1%vs 2024
- GDP, mining and quarryingBanguatQ3.8B2025+5.3%vs 2024
