Mining sales of gold-bearing saprolite
Latest, 2022Q2.2MAnnual release · Not updated
vs 2021−96.5%Q63.5M
Highest since 2018Q63.5M2021 · MEM
Lowest since 2018Q0.00M2019 · MEM
Over time
Q millionYear on year2018–2022Each annual figure, or under Change each against the year before; source: MEM.
Recent years
The latest years, newest first, each but the oldest with its change on the one before.
- 2022Q2.2M−96.5%
- 2021Q63.5M+2,789.4%
- 2020Q2.2M+109,782.0%
- 2019Q0.00M−100.0%
- 2018Q4.3M
Related
Other figures from this topic, each with its latest value, its period and its publisher.
- Permitted floor area, national total2,454,227m²+2.5%vs Q3 2024betterQ4 2024INE(go to the source)
- Building permits, national total2,772permits−4.9%vs Q3 2024worseQ4 2024INE(go to the source)
- GDP, manufacturingQ125.0BThe publisher marks this figure as preliminary2025 p/Banguat(go to the source)
- GDP, mining and quarryingQ3.8BThe publisher marks this figure as preliminary2025 p/Banguat(go to the source)
