Is there build-to-suit supply in Guatemala and what precedents exist?

According to the cited documentsIndustrial buildings

Yes. Precedents: Hansae and ShinWon at Michatoya Pacífico (2025, US$25 M and US$12.5 M); Grupo Salinas at Synergy (groundbreaking Nov 15, 2025); institutionalised BTS supply at Synergy (rent + BTS + tax clusters), Interoceánica ('we build according to the client's requirements'), the 28,800 m² building in Escuintla with a BTS option and Michatoya (land or a completed building); and the in-house DCs of PepsiCo and Nestlé (2020). The 2024-2026 shift runs from selling condominium office-warehouses towards speculative Class A rental (Multinova 2 with no pre-leasing) and park-based BTS, the pattern that usually precedes the arrival of institutional developers. Latam Logistic Properties stated in July 2019 that it was 'looking at' Guatemala; seven years later there is no project, so it is not a live signal.

Read moreRead less

Sources

  • Prensa Libre

    27-jun-2025, Hansae y ShinWon invertirán US$37 millones en Michatoya Pacífico

    prensalibre.comAccessed Aug 19, 2026Go to the source
  • Metroredes

    15-nov-2025, Grupo Salinas

    metroredes.comAccessed Aug 19, 2026Go to the source
  • Synergy Industrial Park

    Sitio del desarrollador

    synergyindustrialpark.com.gtAccessed Aug 19, 2026Go to the source
  • GPI/CityMax

    Listado nave industrial en alquiler 28,800 m² Escuintla

    gpi.com.gtAccessed Aug 22, 2026Go to the source
  • La República

    30-jul-2019, Latam Logistic Properties

    larepublica.netAccessed Aug 22, 2026Go to the source