Load-reduction stages
4 phases since 2011
2011-2024Consortium LegalIt is the Regulation on Wastewater Discharges and Reuse and Sludge Disposal, in force since May 2006, and today the only national water obligation with teeth. Every generating entity must draw up a Technical Wastewater Study (ETAR) characterizing its effluents, discharges, reuse water and sludge, with technical endorsement, and keep it available to MARN. It set a staged reduction of loads (BOD and the other parameters) in four stages from 2011; the final phase, with full parameters, has been mandatory for private generating entities since May 2, 2024. Municipalities obtained an extension to May 2, 2025 through AG 285-2022, for municipal systems only. For foreign investment held to ESG standards it is the design floor for any industrial wastewater treatment plant (PTAR).
Read moreRead less
- AG 236-2006 in force since
Since May 2006
2006MARN - Full parameters mandatory, private generating entities2 May 20242024Consortium Legal
- Extension for municipal systems (AG 285-2022)2 May 20252025MARN
