Skip to content

Latest figures

What is the physical capacity of Puerto Quetzal's pier and what are its draft, vessel-length and congestion limits?

According to the cited documentsPress figureLogistics

Length of the EPQ commercial pier

800 metres

2024-2025EPQ

The commercial pier of the Empresa Portuaria Quetzal (EPQ) is 800 metres long. This is stated in an EPQ statement quoted by El Metropolitano (August 2024), by EPQ president José Antonio Lemus in Prensa Libre (November 2024) and in the analysis by academic and consultant Armando Jacomino reported by La Hora (November 2025). According to that analysis, the port has kept those 800 metres of pier since it opened and has received no structural expansion since 1985. According to the EPQ, the pier was designed to berth four vessels of 180 metres in length. Lemus explained that four ships can be handled at once if they are under 190 metres, but when vessels of 200 metres or more arrive only three can be handled simultaneously, which creates queues of waiting ships. The analysis reported by La Hora says the port handles vessels of up to 240 metres in length and operates at a draught reduced to 10.5 metres, which limits its manoeuvring windows to only a few hours a day. In February 2025, Periódico el Escuintleco, citing Prensa Libre, reported 29 vessels at anchor waiting to discharge. In May 2026, La Hora said that at Puerto Quetzal the Health, Interior and Customs processes, which inspect cargo separately, cause delays of up to 40 days.

Read moreRead less
  • Vessels handled at once

    Four if under 190 metres; three with vessels of 200 metres or more

    Nov 2024Prensa Libre
  • Operating draught

    Reduced to 10.5 metres

    2025La Hora
  • No structural expansion since19852025La Hora
  • Vessel length: design / handled4 vessels of 180 metres (design) / up to 240 metres (handled)2024 / 2025EPQ
  • Vessels at anchor waiting to discharge29Feb 2025Periódico el Escuintleco

Sources

  • La Hora

    Puerto Quetzal atraviesa la mayor crisis operativa

    • No structural expansion since
    • Operating draught
    • Delays from separate Health, Interior and Customs inspections
    lahora.gtAccessed Aug 19, 2026Go to the source
  • Periódico el Escuintleco

    29 buques en fondeo

    • Vessels at anchor waiting to discharge
    elescuintlecoperiodico.comAccessed Aug 19, 2026Go to the source
  • La Hora

    Vacío legal y fricciones políticas

    • No structural expansion since
    • Operating draught
    • Delays from separate Health, Interior and Customs inspections
    lahora.gtAccessed Aug 19, 2026Go to the source
  • El Metropolitano

    EPQ emite disposiciones para agilizar descarga de buques en el muelle comercial

    elmetropolitano.com.gtAccessed Sep 14, 2026Go to the source
  • Prensa Libre

    Puerto Quetzal saldrá a cazar inversionistas: Busca US$200 millones para nuevo muelle

    • Vessels handled at once
    prensalibre.comAccessed Sep 14, 2026Go to the source