According to the cited documentsLogistics
Stretch to be widened (4 lanes)
31 km, km 85.3 (El Rancho) – km 120.3 (Teculután)
2025 tenderAGNYes. The CIV launched an international public tender to widen to four lanes 31 km of the CA-9 North between km 85.3 (El Rancho, El Progreso) and km 120.3 (Teculután, Zacapa), over a 36-month term; the first phase does not include a bypass. Prensa Libre documents an associated loan for the Teculután–Mayuelas stretch. The CA-9 North is the road corridor to Santo Tomás de Castilla and Puerto Barrios. The loan amount and the status of the award are not.
Read moreRead less
- Construction term36 months2025 tenderAGN
