Skip to content

Which construction cost indices exist in Guatemala and how much does it cost to build a warehouse per m²?

According to the cited documentsPer-m² costs: to be confirmedTo be confirmedIndustrial buildings

There are three real instruments: the IPMC from the national statistics institute (INE), a monthly price index for 89 construction materials and services (base Dec 2018=100); the INE's new ICC (2026) with three divisions, family dwellings, non-residential buildings (the one relevant to warehouses) and civil works, which in its first stage measures only single-family social housing, so the non-residential division has no series yet; and the CGC's Materials Price List (monthly, latest visible Jun 2026) plus its quarterly Economic Bulletin (No. 74, May 2026). There is no CGC index called 'ICCV'.

Read moreRead less

Sources

The documents this answer cites, by publisher, with the date each one was consulted and a link to it.

  • INE

    Índice de Precios de Materiales de Construcción

    In Spanishine.gob.gtAccessed Aug 19, 2026Go to the source
  • Diario de Centro América

    16-mar-2026, INE innova en indicadores de precios de construcción

    In Spanishdca.gob.gtAccessed Aug 22, 2026Go to the source
  • Cámara Guatemalteca de la Construcción

    Construcción en Cifras / Análisis Económico

    In Spanishconstruguate.comAccessed Aug 22, 2026Go to the source