Skip to content

Latest figures

What industrial zone does Mixco have and what does its building permit require?

According to the cited documentsMunicipalities

Mixco, 2025 ICL

74.41, rank 4

2025FUNDESA

Mixco dominates the metropolitan northwest with the El Naranjo corridor (zone 4 of Mixco, at the Naranjo-Minerva interchange), home to logistics developments such as Distribodegas, Districentro, Internaranjo, the El Naranjo Business Zone (~40 manzanas, described as 100% industrial - a promotional claim) and the Las Tunas Industrial Park, plus the Sadinsa free zone (Condado El Naranjo). A building permit requires conforming land use, a municipal clearance certificate, property tax (IUSI) paid up to date and plans signed by a licensed professional; the Construction and Urban Planning Regulation was amended by Council Minute 111-2018. The municipality publishes its Cadastre/IUSI Manual of Rules and Procedures (2023). 2025 ICL: 4th in the country (74.41).

Read moreRead less

Sources

  • Citymax

    Desarrollo industrial en Mixco

    gt.citymax-la.comAccessed Aug 19, 2026Go to the source
  • vLex

    Acta 111-2018 Concejo de Mixco

    gt.vlex.comAccessed Aug 19, 2026Go to the source
  • Municipalidad de Mixco

    Manual de Normas y Procedimientos Catastro/IUSI 2023

    munimixco.gob.gtAccessed Aug 19, 2026Go to the source
  • FUNDESA

    Índice de Competitividad Local 2025 · Resultados

    • Mixco, 2025 ICL
    fundesa.org.gtAccessed Aug 19, 2026Go to the source