According to the cited documentsStatus of GEB/TRECSA I and II as at 2026: to be confirmedTo be confirmedLegal framework
Collected by RDC
US$14.6 million
After the 2012 awardProgressive RailroadingThe State lost and paid in the electricity and railway cases under CAFTA-DR, RDC (US$14.6 million collected) and TECO (US$26,793,001 plus US$838,784 in the 2020 resubmission award), and won where the dispute was characterized as purely regulatory or contractual (Iberdrola I and II, IC Power). In the most recent mining case (Kappes, December 2025) the tribunal found breaches without granting damages, and GEB/TRECSA (more than US$400 million claimed) remains pending. The State's official documentary repository is MINECO's trade defense section.
Read moreRead less
- TECO resubmission awardUS$26,793,001 + US$838,784May 13, 2020CIADI
- Damages in KappesUS$0Dec 23, 2025IAReporter