Skip to content
Saturday, September 12, 2026 · Guatemala CityQ7.6282 per US$+0.00%
ADVANCE GUATEMALA
Back to the researchIn research — sources cited, not yet in the verified archive

In depth

Cement producers and installed capacity

Dossier
Sectors and investment opportunities08-sectores.md
Domain
Construction and cementsectores/construccion
Room
Economy/economia
Audited
Audited

Cementos Progreso (CEMPRO) is a near-monopoly in cement. Its San Gabriel plant in San Juan Sacatepéquez carries a reported investment of between US$500 million (Prensa Libre) and about US$1,000 million (Dinero HN), a discrepancy still to be reconciled. Dinero HN reports a capacity of 3 million t/year (a kiln of 4,500 t of clinker a day), taking the group's total above 5 million t/year with La Pedrera and San Miguel; CEMPRO itself reports 2.2 million t/year for San Gabriel, a figure verified in the audit of 19 August 2026. The group expanded into Costa Rica and El Salvador for US$335 million (Bloomberg Línea, 2022). The honest constraint is the long-running community conflict in San Juan Sacatepéquez around San Gabriel, to be treated with sources from both sides.

The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.

Figures

San Gabriel plant investment (Prensa Libre)Prensa Libre
US$500 millionreported
San Gabriel plant investment (Dinero HN)Dinero HN
~US$1,000 millionreported
San Gabriel capacity (Dinero HN)Dinero HN
3 M t/year; kiln 4,500 t clinker/dayreported
San Gabriel capacity (CEMPRO)cempro.com (verificado en auditoría 2026-08-19)
2.2 M t/year2026
Group total capacityDinero HN
>5 M t/year (with La Pedrera and San Miguel)reported
Regional expansion CR/SVBloomberg Línea
US$335 million2022

Caveat

sources disagree on investment (US$500 M vs ~US$1,000 M) and capacity (3 M vs 2.2 M t/year) — to be reconciled

Sources

Organizations named in the answer

  • Cementos Progreso (CEMPRO)Near-monopoly in cement and a case of outbound FDI (it bought Cemex's operations in CR/SV for US$335 million); the San Gabriel plant has reported capacity of 2.2-3 million t/year depending on the source.Company case
  • Prensa LibreConfirms the 10% capital gains tax (art. 92, Decree 10-2012), the taxable base, the 10-day deadline and SAT form 1321Other

Directory of organizations

Related records

This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.