The EXMIBAL/Inco background of the Fénix mine in El Estor
- The record of foreign investment: real cases
- Foreign investment, in figures
- not audited
The nickel project in El Estor, Izabal, begins with the EXMIBAL concession granted to Canada's Inco in 1971: 385 km² and an initial investment of US$228 million. The operation has been inactive since 1980 and remained so for three decades, which makes it one of the historic foreign-investment failures the dossier collects. Both data points come from Wikipedia and were not cross-checked against a primary source.
The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.
Figures
- EXMIBAL concession (Inco)
- 1971, 385 km²
- EXMIBAL initial investment
- US$228 million
- Operation inactive since
- 1980
Caveat
Sources
Related records
This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.