Skip to content
Saturday, September 12, 2026 · Guatemala CityQ7.6282 per US$+0.00%
ADVANCE GUATEMALA
Back to the researchIn research — sources cited, not yet in the verified archive

In depth

The TCQ case and APM Terminals' arrival at Puerto Quetzal

Dossier
Infrastructure and logistics06-logistica.md
Domain
Ports, cargo and corridorslogistica
Room
Trade/comercio
Audited
not audited

On 11 July 2012 EPQ signed a 25-year usufruct with Terminal de Contenedores Quetzal S.A. (TCQ) under the government of Otto Pérez Molina. In 2016 CICIG and the special prosecutor's office (FECI) revealed that Pérez Molina and Roxana Baldetti led a network of 15 people that sought the irregular signing of the contract in exchange for bribes of more than US$30 million (the 'TCQ case'). APM Terminals, which had acquired Grup Marítim TCB (owner of TCQ) claiming no knowledge of the contract's origin, paid the State US$32.7 million in civil reparation within a US$43.2 million MOU (2016). In 2017 APM ended up with 85% of TCQ and the IFC with 15%, with the approval of Congress; the terminal has operated since then as APM Terminals Quetzal.

The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.

Figures

EPQ–TCQ usufructSoy502
25 yearssigned 11 Jul 2012
Bribes investigated (TCQ case)Soy502 / No Ficción
more than US$30 M2016
Civil reparation paid by APM / total MOUT21 / PortalPortuario
US$32.7 M / US$43.2 M2016
APM Terminals / IFC stakes in TCQSoy502 / IFC
85% / 15%2017

Caveat

press figures; check against the court files and IFC disclosure

Sources

Related records

This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.