Private electricity generation and its regulation

Dossier
The legal framework for foreign investment02-marco-legal.md
Domain
Sectoral statutes: power and mininglegal-sectorial
Room
Law/ley
Audited
not audited

Yes. The General Electricity Law (Decree 93-96) was issued on 16 October 1996, signed into law the following month and published on 15 November 1996; it opened generation to private companies, set up an authorizations regime and separated generation, transmission and distribution. The regulator is the CNEE, the technical body of the Ministry of Energy and Mines (MEM), installed on 28 May 1997, which oversees the obligations of awardees and concession holders and prevents anti-competitive conduct; its regulation (RLGE) is published by the CNEE. The costliest investor-state disputes for Guatemala (TECO, Iberdrola, IC Power) arose in electricity distribution; see the arbitration chunks.

The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.

Figures

General Electricity Law issuedAMM
16 October 19961996
General Electricity Law publishedAMM
15 November 19961996
CNEE installedCNEE
28 May 19971997

Sources

Related records

This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.