Skip to content
Saturday, September 12, 2026 · Guatemala CityQ7.6282 per US$+0.00%
ADVANCE GUATEMALA
Back to the researchIn research — sources cited, not yet in the verified archive

In depth

Cementos Progreso in San Juan Sacatepéquez

Dossier
Water for industry14-agua-industrial.md
Domain
Industrial water, wells and dischargesagua
Room
Energy/energia
Audited
Audited

In May 2007 a community consultation in 12 communities of San Juan Sacatepéquez returned 8,994 votes against the cement company and 4 in favor (verified 2026-08-22 in OCMAL). The conflict turned violent: 17 injured (2 seriously) on 3 July 2014 when the resistance in the El Puente sector was evicted; the audit corrected the date, previously given as '2013'. Water is among the territorial grievances. Sources: EJAtlas, OCMAL and GAIA/no-burn.org.

The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.

Figures

Community consultation (12 communities)OCMAL
8,994 votes against vs 4 in favorMay 2007
Injured in the El Puente sector evictionGAIA / no-burn.org
17 (2 serious)3 Jul 2014

Sources

Related records

This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.