Skip to content
Saturday, September 12, 2026 · Guatemala CityQ7.6282 per US$+0.00%
ADVANCE GUATEMALA
Back to the researchIn research — sources cited, not yet in the verified archive

In depth

Governmental Agreement 236-2006 and its requirements for industry

Dossier
Water for industry14-agua-industrial.md
Domain
Industrial water, wells and dischargesagua
Room
Energy/energia
Audited
Audited

It is the Regulation on Wastewater Discharges and Reuse and Sludge Disposal, in force since May 2006, and today the only national water obligation with teeth. Every generating entity must draw up a Technical Wastewater Study (ETAR) characterizing its effluents, discharges, reuse water and sludge, with technical endorsement, and keep it available to MARN. It set a staged reduction of loads (BOD and the other parameters) in four stages from 2011; the final phase, with full parameters, has been mandatory for private generating entities since 2 May 2024. Municipalities obtained an extension to 2 May 2025 through AG 285-2022, for municipal systems only. For foreign investment held to ESG standards it is the design floor for any industrial wastewater treatment plant (PTAR).

The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.

Figures

AG 236-2006 in force sinceMARN
since May 20062006
Load-reduction stagesConsortium Legal
4 phases since 20112011-2024
Full parameters mandatory, private generating entitiesConsortium Legal
2 May 20242024
Extension for municipal systems (AG 285-2022)MARN
2 May 20252025

Sources

Related records

This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.