Skip to content
Saturday, September 12, 2026 · Guatemala CityQ7.6282 per US$+0.00%
ADVANCE GUATEMALA
Back to the researchIn research — sources cited, not yet in the verified archive

In depth

Shifts, working hours and 24/7 operation under the Labor Code

Dossier
Manual: opening a garment factory13-manual-fabrica.md
Domain
Social security, work permits and shiftslaboral
Room
Talent/talento
Audited
not audited

The Labor Code sets the day shift at a maximum of 8 hours a day and 48 a week; the night shift at 6 hours and 36 a week; the mixed shift at 7 hours and 42 a week; overtime carries a 50% premium. The implication for plant design — an editorial inference by the dossier, not a citable figure — is that a 24/7 operation requires four crews or a structural overtime bill. The primary sources are in dossier 04 §10.

The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.

Figures

Maximum day shiftdossier 04 §10
8 h/day, 48 h/weekLabor Code in force
Night / mixed shiftdossier 04 §10
6 h/36 h · 7 h/42 hLabor Code in force
Overtime premiumdossier 04 §10
+50%Labor Code in force

Caveat

Indirect citation via dossier 04; the 24/7 reading is an editorial inference

Sources

  • Código de Trabajo de Guatemala (Decreto 1441), jornadas — fuentes primarias citadas en el dossier 04 §10; este dossier no reproduce la URLNo site publishedconsulted

Related records

This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.