Skip to content
Saturday, September 12, 2026 · Guatemala CityQ7.6282 per US$+0.00%
ADVANCE GUATEMALA
Back to the researchIn research — sources cited, not yet in the verified archive

In depth

Decree 29-2024 and the CIV's road project portfolio

Dossier
Infrastructure and logistics06-logistica.md
Domain
Ports, cargo and corridorslogistica
Room
Trade/comercio
Audited
Audited

Decree 29-2024, the Priority Road Infrastructure Law, was approved on 12 November 2024 by 118 votes (verified in audit) and gives priority to 10 Central American (CA) routes and one ring road. The 'Vía Exprés' PPP, part of Decree 29-2024, appears in ANADIE's pipeline. The CIV's pipeline totals 143 projects covering 2,761.76 km of works, of which 64 are under way covering 1,308.66 km (Diario de Centro América). The official mileage of the registered road network could not be obtained: the Directorate General of Roads page returned a 403 error.

The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.

Figures

Decree 29-2024 approvedLa Hora
12 Nov 2024, 118 votes2024
Prioritized routesLa Hora
10 CA routes and one ring road2024
CIV pipeline: projects / km of worksDiario de Centro América
143 / 2,761.76 km2025
Projects under way / kmDiario de Centro América
64 / 1,308.66 km2025

Caveat

the CIV pipeline and Vía Exprés were not verified in audit; road network mileage outstanding

Sources

Related records

This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.