Skip to content
Saturday, September 12, 2026 · Guatemala CityQ7.6282 per US$+0.00%
ADVANCE GUATEMALA
Back to the researchIn research — sources cited, not yet in the verified archive

In depth

PEG-4-2022 tender awards and prices

Dossier
Energy, water and telecommunications05-energia-agua.md
Domain
The power market and its tariffsenergia
Room
Energy/energia
Audited
not audited

PEG-4-2022, awarded in August 2023, contracted ~399.27 MW for the guaranteed capacity block, entering operation between 2026 and 2028 under 15-year contracts. Prices came in below US$90/MWh on a monomic basis, with a record US$20.32/MWh in the energy-only bid. The project detail is in Resolution CNEE-196-2023, cited by the AMM.

The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.

Figures

Guaranteed capacity contracted in PEG-4MEM/FUNDESA, pág. 16
~399.27 MWawarded Aug 2023; entry into service 2026–2028
Contract termMEM/FUNDESA, pág. 16
15 yearsPEG-4-2022
Monomic priceMEM/FUNDESA, pág. 16
< US$90/MWhPEG-4-2022
Record energy-only priceMEM/FUNDESA, pág. 16
US$20.32/MWhPEG-4-2022

Sources

Related records

This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.