Back to the researchIn research — sources cited, not yet in the verified archive

In depth

Self-generation and installed distributed renewable generation (GDR)

Dossier
Energy, water and telecommunications05-energia-agua.md
Domain
The power market and its tariffsenergia
Room
Energy/energia
Audited
not audited

The Distributed Renewable Generator (GDR) category covers plants under 5 MW; as of 1 April 2025 there were 64 GDRs registered with the AMM. According to Energia Estrategica, Guatemala has passed 200 MW installed between self-producers and GDRs; that is a press figure, still to be checked against the CNEE's GDR and UAEE Statistical Report 2020-2024. This dossier does not set out the procedural requirements for connecting self-generation.

The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.

Figures

GDR thresholdAMM, Oportunidades de inversión, Tabla 1
<5 MWin force
Registered GDRsAMM, Oportunidades de inversión, Tabla 1
64as of 01 Apr 2025
Installed between self-producers and GDRs (press)Energía Estratégica — cifra de prensa
>200 MWper Energía Estratégica

Caveat

200 MW: press figure — verify against the CNEE GDR/UAEE report

Sources

Related records

This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.